Number of students: 930
Total Need: USD 29 217/UAH 1 068 171
Rehabilitation needs:
Expense | Pricing USD |
---|---|
Construction works - plastering of walls - puttying walls - painting the walls - plastering and puttying of slopes - restoration of concrete window sills - puttying the ceiling - rail suspended ceiling - leveling the floor - arrangement of the podium - installation of linoleum covering |
16 658 |
Electricity - laying electric cable - installation of sockets and switches - Internet connection and WiFi arrangement |
11 340 |
Taxes | 1 218 |
29 217 |
Number of students: 930
Total Need: USD 46 966/UAH 1 717 091
Rehabilitation needs:
Expense | Pricing USD |
---|---|
Construction works - installation of windows - plastering of walls - puttying walls - painting the walls - plastering and puttying of slopes - restoration of concrete window sills - puttying the ceiling - rail suspended ceiling - leveling the floor - arrangement of the podium - installation of linoleum covering |
36 506 |
Electricity - laying electric cable - installation of sockets and switches - puttying walls - Internet connection and WiFi arrangement |
8 939 |
Sanitary ware | 601 |
Taxes | 1 820 |
46 966 |
Number of students: 930
Total Need: USD 46 966/UAH 1 717 091
Rehabilitation needs:
Expense | Pricing USD |
---|---|
Construction works - installation of windows - plastering of walls - puttying walls - painting the walls - plastering and puttying of slopes - restoration of concrete window sills - puttying the ceiling - rail suspended ceiling - leveling the floor - arrangement of the podium - installation of linoleum covering |
36 506 |
Electricity - laying electric cable - installation of sockets and switches - puttying walls - Internet connection and WiFi arrangement |
8 939 |
Sanitary ware | 601 |
Taxes | 1 820 |
46 966 |
Number of students: 1294
Total Need: USD 246 310/UAH 9 005 111
Rehabilitation needs:
Expense | Pricing USD |
---|---|
Construction works - 180 broken windows, 30 of them - large showcase ones - 2 knocked out metal-plastic doors, 6 destroyed paneled doors - severely damaged porch, roof, ceiling - partially destroyed wall of one of the classrooms - 4 m2 - 6 radiators are fully impaired |
193 789 |
Technical inspection and engineering services | 2 907 |
Examination of project documentation | 1 984 |
Other expenditures | 6 884 |
Taxes | 40 746 |
Number of students: 994
Total Need: USD 180 800/UAH 6 610 038
Rehabilitation needs:
Expense | Pricing USD |
---|---|
Construction works - through cracks in the outer wall of the school gym - damages to the filling of inter-panel joints of the floor - partially damaged roofing, partitions - 110 broken windows and damaged window frames - severely damaged heating system |
142 012 |
Technical inspection and engineering services | 2 130 |
Examination of project documentation | 1 862 |
Other expenditures | 4 973 |
Taxes | 29 823 |
Number of students: 1451
Total Need: USD 98 793/UAH 3 611 861
Rehabilitation needs:
Expense | Pricing USD |
---|---|
Construction works - 141 broken windows - 17 knocked out doors - 200 square meters of the roof damaged by the shell fragments - 8 square meters of the roof of the gymnasium was breached - damaged wall on the 3rd floor - severely damaged porch, the gate and a part of the fence - shrapnel damages of the school walls |
76 212 |
Technical inspection and engineering services | 1 143 |
Examination of project documentation | 2 328 |
Other expenditures | 2 644 |
Taxes | 16 466 |
Number of students: 1716
Total Need: USD 41 028/UAH 1 500 000
Rehabilitation needs:
Expense | Pricing USD |
---|---|
Floor and walls | 9 281 |
Escape stair | 2 226 |
Installation of ventilation systems | 15 128 |
Furniture and equipment | 14 393 |