Damage costs

School № 20, rehabilitation of the Computer Science classroom

Number of students: 930
Total Need: USD 29 217/UAH 1 068 171
Rehabilitation needs:

Expense Pricing USD
Construction works
- plastering of walls
- puttying walls
- painting the walls
- plastering and puttying of slopes
- restoration of concrete window sills
- puttying the ceiling
- rail suspended ceiling
- leveling the floor
- arrangement of the podium
- installation of linoleum covering
16 658
Electricity
- laying electric cable
- installation of sockets and switches
- Internet connection and WiFi arrangement
11 340
Taxes 1 218
29 217

School № 20, rehabilitation of the Physics classroom

Number of students: 930
Total Need: USD 46 966/UAH 1 717 091
Rehabilitation needs:

Expense Pricing USD
Construction works
- installation of windows
- plastering of walls
- puttying walls
- painting the walls
- plastering and puttying of slopes
- restoration of concrete window sills
- puttying the ceiling
- rail suspended ceiling
- leveling the floor
- arrangement of the podium
- installation of linoleum covering
36 506
Electricity
- laying electric cable
- installation of sockets and switches
- puttying walls
- Internet connection and WiFi arrangement
8 939
Sanitary ware 601
Taxes 1 820
46 966

School № 20, rehabilitation of the Сhemistry classroom

Number of students: 930
Total Need: USD 46 966/UAH 1 717 091
Rehabilitation needs:

Expense Pricing USD
Construction works
- installation of windows
- plastering of walls
- puttying walls
- painting the walls
- plastering and puttying of slopes
- restoration of concrete window sills
- puttying the ceiling
- rail suspended ceiling
- leveling the floor
- arrangement of the podium
- installation of linoleum covering
36 506
Electricity
- laying electric cable
- installation of sockets and switches
- puttying walls
- Internet connection and WiFi arrangement
8 939
Sanitary ware 601
Taxes 1 820
46 966

School #29

Number of students: 1294
Total Need: USD 246 310/UAH 9 005 111
Rehabilitation needs:

Expense Pricing USD
Construction works
- 180 broken windows, 30 of them - large showcase ones
- 2 knocked out metal-plastic doors, 6 destroyed paneled doors
- severely damaged porch, roof, ceiling
- partially destroyed wall of one of the classrooms - 4 m2
- 6 radiators are fully impaired
193 789
Technical inspection and engineering services 2 907
Examination of project documentation 1 984
Other expenditures 6 884
Taxes 40 746

School #28

Number of students: 994
Total Need: USD 180 800/UAH 6 610 038
Rehabilitation needs:

Expense Pricing USD
Construction works
- through cracks in the outer wall of the school gym
- damages to the filling of inter-panel joints of the floor
- partially damaged roofing, partitions
- 110 broken windows and damaged window frames
- severely damaged heating system
142 012
Technical inspection and engineering services 2 130
Examination of project documentation 1 862
Other expenditures 4 973
Taxes 29 823

School #31 & #25 Elementary School (shared building)

Number of students: 1451
Total Need: USD 98 793/UAH 3 611 861
Rehabilitation needs:

Expense Pricing USD
Construction works
- 141 broken windows
- 17 knocked out doors
- 200 square meters of the roof damaged by the shell fragments
- 8 square meters of the roof of the gymnasium was breached
- damaged wall on the 3rd floor
- severely damaged porch, the gate and a part of the fence
- shrapnel damages of the school walls
76 212
Technical inspection and engineering services 1 143
Examination of project documentation 2 328
Other expenditures 2 644
Taxes 16 466

School #3

Number of students: 1716
Total Need: USD 41 028/UAH 1 500 000
Rehabilitation needs:

Expense Pricing USD
Floor and walls 9 281
Escape stair 2 226
Installation of ventilation systems 15 128
Furniture and equipment 14 393